This is a series on Ghost Hunting Theories chronicling a present-day Sasquatch experiment utilizing techniques employed by the researcher over a decade ago in a completely different location at an habituation site.
Today, the researcher's ongoing study is being performed in an urban setting in the southern half of the US, hundreds of miles from the original site and the results are amazingly similar. During the series, I will be sharing the evolution of these experiments and their results from his journal.
For earlier installments go to THIS LINK.
Friday May 22, 2020
#1. 8:20am---on the entry cedar tree, I put a container of treats (dates, walnuts).
#2. 8:21am---around the base of the cedar tree, the hogs have been rooting.
#3. 8:21am---a better view of the rooting area below and around the cedar tree.
#4. 8:29am---the paint can is still upright in the pipe but turned.????
#5. 8:31am---I turned the paint can back around and put another treat container there. (dates, figs, dried apricots, raisins, walnuts).
#6. 8:31am---looking straight through the main pipe with the set-up items.
#7. 8:34am---I added the yellow paint around the rim of the main pipe.
#8. 8:34am---next, I painted a stick hunter on the side of the main pipe opposite from the clear area outside the tree line.
#9. 8:39am---the 2' x 4' is angled again.????
#10. 8:41am---I reset the 2' x 4' to the horizontal position. I then painted yellow dots on it and yellow streaks on the immediate limbs.
#11. 8:49am---at the mid-site, I spray painted yellow dots onto the attached 2' x 4' on the tree. I then spray painted another stick hunter onto this tree.
#12. 8:51am---at the mid-site area, on another tree, I spray painted a stick hunter with green paint.
#13. 8:59am---at the main set-up site, the water meter cover set -up was messed with.????
#14. 8:59am---an overhead view of the above set-up.????
#15. 9:03am---more items scattered over the site.????
Photos #16-#24 shows various views of the scattered set-up items.????
#25. 9:09am---I re-hung my signature sheet back on the ball's bucket handle using the beads.
#26. 9:12am---the blue rock is still on the water meter cover stack.
#27. 9:17am---the bone is on the ground.????
#28. 9:17am---more scattered items .????
#29. 10:03am---cleaned up the site and did new set-ups.
#30. 10:03am---an overhead view of the set-ups.
#31. 10:03am---cleaned the site.
#32. 10:04am---another new set-up.
#33. 10:04am---put away the used treat containers. They are now stored in the plastic garbage can.
#34. 10:05am---a view across the site.
#35. 10:05am---another view across the site.
#36. 10:05am---a third view across the site.
#37. 10:16am---I added a 'BF' drawings sheet at the horizontal 2' x 4' along the path on the way out near the pipes.
This concludes Friday May 22, 2020. Area/Site 1
Comments
Post a Comment